SAIA LTL Freight – Marysville (In Progress)
Project Type
Logistics
Project Size
11 Acres
This 25,164-square-foot facility in Marysville features a 5,767-square-foot office space connected to a 19,397-square-foot dock. The standard tilt-up construction incorporates 51 loading bay doors, allowing for streamlined freight operations. Alongside the structural work, the project included extensive site and civil development, such as a 1-acre detention pond to manage water flow and environmental impact.
Inside, the office area was designed for efficiency and comfort, featuring an open office layout, four private management offices, a training room, and a dispatch office. Additionally, the drivers’ lounge/break room offers a space for rest, while separate bathroom facilities cater to both drivers and office staff. The facility was meticulously planned and executed to ensure it meets all the required needs while supporting the growth and efficiency of SAIA.